Client
HCA Bayonet Point Hospital –
Hudson, FL
The Need
Temporary kitchen providing full cooking, prep, washing, and storage for 300+ patients during renovations.
The Solution
Complete modular kitchen with cook, prep, and wash modules, plus integrated cold and dry storage.
HCA Bayonet Point Hospital, a large healthcare facility and Level II Trauma Center, faced a critical challenge during a major renovation project: maintaining uninterrupted foodservice operations while construction was underway. With a patient population exceeding 300, consistent and reliable meal service was essential to supporting patient care, staff efficiency, and overall hospital operations.
To meet this need, Kitchens To Go designed and delivered a high-capacity, three-unit modular kitchen complex to support daily hospital foodservice demands for a 12-month lease term. The 2,016-square-foot kitchen footprint included dedicated cook, prep, and wash modules, delivering efficient workflows and performance aligned with healthcare standards. To support inventory and daily operations, the solution also included 960 square feet of cold and dry storage, comprised of two walk-in coolers, 2 walk-in freezers, and two dry storage units, ensuring ample space for both perishable and non-perishable ingredients. All units were delivered in excellent condition, with a combination of new and well-maintained equipment to ensure reliability and full compliance with healthcare standards.
A key challenge of the project was the installation location. The temporary kitchen complex needed to be placed within an active loading dock area—a critical hub for hospital operations. Throughout installation and the entire lease term, the loading dock had to remain fully accessible to support deliveries, logistics, and emergency needs.
Through careful planning, close coordination, and precise execution, Kitchens To Go successfully integrated the modular kitchen into the tight footprint without disrupting hospital operations. Strategic layout and site planning ensured safe access, efficient workflows, and continued compliance with healthcare requirements, while allowing the hospital’s logistics teams to operate as usual.
Once operational, the modular kitchen delivered immediate value. Hospital staff maintained seamless foodservice operations, ensuring patients continued to receive consistent, high-quality meals throughout the renovation period. The scalable design and high-capacity equipment supported peak service times, helping sustain productivity for both clinical and foodservice teams.
This project highlights Kitchens To Go’s ability to deliver reliable, high-performance modular kitchen solutions in demanding healthcare environments—where continuity, precision, and flexibility matter most.
Kitchens To Go provides mobile, modular and containerized solutions for projects of any timeframe. Markets and conditions are changing constantly, however, so please connect with us to find out what options are currently available for your project’s need and timeline.