John Polk Correctional
In need of a dire renovation, KTG provided John Polk Correctional Facility with a temporary kitchen complex to maintain foodservice continuity.
Client
John E Polk Correctional Facility
The Need
To renovate the main kitchen, which was located in the basement of the facility.
The Solution
A flexible temporary kitchen complex to include Cook, Wash, and Prep modules along with a cooler, freezer, dry storage and a bathroom.
project description
The John E Polk Correctional Facility needed to renovate their kitchen, which was located in the basement. Because of security restrictions, phasing the work was not an option. Kitchen To Go’s temporary kitchen complex included cook, wash, and prep modules along with a cooler, freezer, dry storage, and a bathroom. The design of the kitchen complex allowed it to be placed in unique area that, when completed, the interim facility was completely enclosed and secured.
Kitchens To Go provides mobile, modular and containerized solutions for projects of any timeframe. Markets and conditions are changing constantly, however, so please connect with us to find out what options are currently available for your project’s need and timeline.