Case Studies Corrections

John Polk Correctional

CASE STUDY

John Polk Correctional

In need of a dire renovation, KTG provided John Polk Correctional Facility with a temporary kitchen complex to maintain foodservice continuity.

Client

John E Polk Correctional Facility

The Need

To renovate the main kitchen, which was located in the basement of the facility.

The Solution

A flexible temporary kitchen complex to include Cook, Wash, and Prep modules along with a cooler, freezer, dry storage and a bathroom.

project description

The John E Polk Correctional Facility needed to renovate their kitchen, which was located in the basement. Because of security restrictions, phasing the work was not an option. Kitchen To Go’s temporary kitchen complex included cook, wash, and prep modules along with a cooler, freezer, dry storage, and a bathroom. The design of the kitchen complex allowed it to be placed in unique area that, when completed, the interim facility was completely enclosed and secured.

Related Case Studies
Connect with us.

Kitchens To Go provides mobile, modular and containerized solutions for projects of any timeframe. Markets and conditions are changing constantly, however, so please connect with us to find out what options are currently available for your project’s need and timeline.

Categories
Case Studies Corrections

Orleans Parish Sheriff’s Office (OPSO)

CASE STUDY

Orleans Parish Sheriff’s Office (OPSO)

After Hurricane Katrina, OPSO needed an interim kitchen that could remain portable during the construction of a permanent replacement facility. 

Client

Orleans Parish Sheriff’s Office

The Need

After Hurricane Katrina, 1000+ inmates were displaced and the Orleans Parish Sheriff’s Office needed an interim kitchen to be used during the construction of a permanent replacement facility.

The Solution

Kitchens to Go used modular units to create cook, wash, and prep areas supported by an open layout for visual communication.

project description

Kitchens To Go brought in a kitchen complex consisting of Cook, Wash and Prep modules for the kitchen area. The designed layout with open space among the modules allowed for visual communication and supervision. In addition, the complex contained a walk-in freezer, walk-in cooler, storage, loading dock, and an in-house laundry facility.

quick facts
Related Case Studies
Connect with us.

Kitchens To Go provides mobile, modular and containerized solutions for projects of any timeframe. Markets and conditions are changing constantly, however, so please connect with us to find out what options are currently available for your project’s need and timeline.

;